Draft Energy Supplementary Planning Document
Draft Energy SPD
Appendix 1 - Climate Change and Energy Questionnaire
When should this questionnaire be used?
This questionnaire is for minor developments (developments from one to nine residential units and one to 1000 square meters of non-residential floor space) and householder developments. Developments of a scale above these thresholds (major developments) should not use the questionnaire, but should instead submit a Sustainability Statement and an Energy Statement as detailed in this SPD.
What is the purpose of this questionnaire?
Policy EM2 requires developments to be designed and constructed to meet the relevant Building Regulations. These requirements for information will be deemed to have been met if a correctly completed questionnaire is submitted.
The questions in the questionnaire are based on requirements set out in Local Plan policies and you should refer to these to make full use of the questionnaire. The Energy SPD sets out guidance on the matters covered within the questionnaire. The questionnaire is not an exhaustive list of sustainability matters and additions to the questionnaire are welcome.
The questionnaire is intended to guide development towards sustainable outcomes through compliance with Local Plan policy, from the initial proposal and site layout through to detailed design proposals, the construction process and finally the operation of the completed building. As a result, it is important that the questionnaire is first considered at the outset of planning and at the earliest stage of design. It should be updated as plans evolve.
If planning permission is granted, a condition will be applied requiring work to be carried out in accordance with the information provided in the questionnaire. It is important that the questionnaire is completed in good faith and any works identified within it are deliverable.
Applicant's name: | |
Agent's name: | |
Site Address: | |
Application reference (if known): | |
Description of proposal:(e.g. total and types of units/floorspace) | |
Questionnaire prepared by:(name and qualification/job title) | |
Signature of above: | |
Energy information prepared by:(name and qualification/job title): | |
Signature of above: |
Part 1: Sustainable design, construction and climate change adaptation1. Efficient use of minerals, use of secondary aggregates, waste minimisation and reuse of material from excavation and demolition.
1.a Will the use of primary minerals be minimised through e.g. the use of renewable materials, recycled and secondary aggregates, and other recycled and reused materials? Please provide details.
1b. Will demolition/excavation material from the proposed works be reused on site? Please provide details of where material will be derived and where it will be used.
1c. Will unused mineral waste be sent for reuse or recycling? Please provide details.
1d. Will non-mineral construction waste (e.g. packaging, timber, plastics) be minimised? Please provide details.
1e. Will locally sourced materials be used? Please provide details.
1f. Will materials be sustainably sourced (e.g. FSC certified timber)? Please provide details.
2. Low energy design: landform, layout, building orientation, massing and landscaping (PolicyEM2). See 'Site layout, landscaping and urban form' and 'Building design' in the sustainable design and construction guide in section 5 of the SPD.
2a. Will operational energy demand be minimised through low energy design and the use of energy efficient fabric? Please provide details. This information should align with the energy data provided in parts 2a and 2b of this questionnaire.
2b. Has the layout of the site, landscaping and orientation of buildings taken account of solar receipts and other environmental factors to reduce the need for mechanical heating and artificial lighting in the development? Please provide details.
2c. Will the internal layout of buildings make best use of solar gain and natural light? Please provide details.
2d. Will passive cooling/ventilation measures be incorporated into the scheme? Please provide details.
2e. Will the scheme include mechanical cooling (e.g. air conditioning)? If so, explain why passive measures would not be adequate.
3. Water efficiency (Policy EM2). See 'Water efficiency' in the sustainable design and construction guide in section 5 of the SPD.
3a. If the scheme includes new dwellings, will these be designed to the national optional building regulation water efficiency standard of 110 litres per person per day (regulation 36(2b))? The relevant Water Efficiency Calculation(s) (Part G) for the new dwellings should be submitted to the Council prior to occupation.
3b. For all developments, will water efficiency measures be incorporated into the scheme to reduce the demand for water? Please provide details.
3c. For all developments, will water harvesting measures be incorporated into the scheme? Please provide details.
4. Measures that enable sustainable lifestyles for building occupants (Policy EM2).
4a. Will measures that enable sustainable lifestyles for building occupants be incorporated into the scheme? Please provide details.
5. Climate change adaptation.
5a. Will the scheme incorporate adaptations for the full range of expected climate impacts including: hotter/drier summers, warmer/wetter winters, more frequent and severe heatwaves and overheating, and more frequent and severe heavy rainfall events and flooding? Please provide details.
5b. Will the use of soft landscaping and permeable surfaces be maximised (as opposed to hard surfacing)? Please provide details.
5c. Will surface water be managed by Sustainable Drainage Systems (SuDS)? Please provide details.
6. Any further information6a. Please provide information about any other sustainable design, construction and climate change measures that will be incorporated into the scheme.
Part 2: Energy7. Combined (Cooling) Heating and Power ((C)CHP) networks (Policy EM2).
7a. Will the development fall within the vicinity of a (C)CHP/heat distribution network (of any scale from single building to district heat)? If so, please list the identified networks.
7b. If the development will fall within the vicinity of a (C)CHP/heat distribution network, will the proposed development connect to it or be connection-ready? If not, please set out a clear justification.
7c. Is the development within a Heat Priority Area? If so, is a (C)CHP or heat distribution network proposed as the primary source of energy for the development? If not, please set out a clear justification.
7d. If a new (C)CHP or heat distribution network is proposed, is it designed in accordance with the CIBSE Heat Networks Code of Practice? If not, please provide a clear justification.
8. Low and zero carbon energy
8a. If the scheme includes the provision of low and zero carbon technologies, provide details of the proposed energy systems here including: type of technology, location of installation and predicted energy yield.
9. New buildings: Carbon reduction calculation9a. Will the proposed scheme deliver any new buildings (net or gross)?
9b. If the answer to 9a is yes, please complete the following carbon reduction calculation template in part 2b.
If you need this information in another format or language please contact us
Telephone: (024) 7683 1109
e-mail: planningpolicy@coventry.gov.uk
Skip to actions